• facebook
  • instagram
  • linkedin

Crossview Covenant Church

Our work at Crossview Covenant Church consisted of two projects. We added seven additional classrooms, an office, storage space and restrooms in the children’s and the 5Cs Preschool wing. These classrooms were added to foster continued growth with Crossview’s 5Cs program. The entrance to the children’s wing was reworked to create a better system for check-ins to keep safety as a top priority. The other half of the facility was renovated to be more functional. The former Great Room was split and built out with new carpet, paint and additional walls to transform it into an office and the middle school and high school lounge. Through the Construction Manager at Risk method, this project was completed on time and under budget.

Contact Us

201 N Riverfront Drive, Suite 210, Mankato, MN 56001

3255 Garfield Ave, Suite 200, Minneapolis, MN 55408

507-625-5417

Recent Projects

  • Bridge Plaza
    Bridge Plaza
    Development, Featured Projects, Office, Recent Projects
  • Tiller + Main
    Tiller + Main
    Housing, Recent Projects, Retail / Entertainment
default
default
Bridge Plaza – Mankato, MN – 2021_PI (2)
Bridge Plaza – Mankato, MN – 2021_PI (2)
Bridge Plaza – Mankato, MN – 2021_PI (9)
Bridge Plaza – Mankato, MN – 2021_PI (9)
Bridge Plaza

The 5 story mixed-use building, developed by Brennan Properties and built by Brennan Construction, was completed in 2020. Located in the center of Mankato, between Downtown and Old Town, Mankato and North Mankato, this project is a hub of activity, bridging the gap between various parts of town.

Surface parking, covered parking, 6 luxury apartments on 5th floor, community training room on 2nd floor, numerous tenant buildouts.

Categories :
Development, Featured Projects, Office, Recent Projects
default
default
9.8.21
9.8.21
Tiller + Main

Formerly the Valley Green Mall, this development was integral to connecting Main Street in downtown LeSueur. Part of the building was demolished to make space for Main Street to connect. Main floor tenant spaces were remodeled or built out, including storefronts that would open onto Main Street. Tenants from the second level were moved down to the main floor. The second floor was then transformed into apartments.

56,000 SF. 17 apartments. 11 commercial suites.

Categories :
Housing, Recent Projects, Retail / Entertainment

get social:
facebookinstagramlinkedin

© 2024 - Brennan - All rights reserved