• facebook
  • instagram
  • linkedin

One of my primary concerns during the construction process was to the nursing home residents living in the ‘construction zone’ as well as the employees who needed to work there. The construction workers were respectful to the elderly clientele and maintained a safe environment for themselves and those around them. . . . The workers were gentle and respectful in their interactions and it reinforced to me that we had selected a contractor with similar values to those that drive our company and services.

The timeline of the entire project was driven by a deadline for one-time discretionary federal/state funds, resulting in condensed design, bidding, and construction schedules. . . . Brennan Construction was accommodating to this process and worked with us to have as little disruption to our provision of services as possible.

I am ecstatic with the end results of the project. . . . Together we have built a building that will provide a home to our parents, family, friends, and neighbors. Thank you for leaving your mark on this community.

Contact Us

201 N Riverfront Drive, Suite 210, Mankato, MN 56001

3255 Garfield Ave, Suite 200, Minneapolis, MN 55408

507-625-5417

Recent Projects

  • Tiller + Main
    Tiller + Main
    Housing, Recent Projects, Retail / Entertainment
  • Bridge Plaza
    Bridge Plaza
    Development, Featured Projects, Office, Recent Projects
default
default
9.8.21
9.8.21
Tiller + Main

Formerly the Valley Green Mall, this development was integral to connecting Main Street in downtown LeSueur. Part of the building was demolished to make space for Main Street to connect. Main floor tenant spaces were remodeled or built out, including storefronts that would open onto Main Street. Tenants from the second level were moved down to the main floor. The second floor was then transformed into apartments.

56,000 SF. 17 apartments. 11 commercial suites.

Categories :
Housing, Recent Projects, Retail / Entertainment
default
default
Bridge Plaza – Mankato, MN – 2021_PI (2)
Bridge Plaza – Mankato, MN – 2021_PI (2)
Bridge Plaza – Mankato, MN – 2021_PI (9)
Bridge Plaza – Mankato, MN – 2021_PI (9)
Bridge Plaza

The 5 story mixed-use building, developed by Brennan Properties and built by Brennan Construction, was completed in 2020. Located in the center of Mankato, between Downtown and Old Town, Mankato and North Mankato, this project is a hub of activity, bridging the gap between various parts of town.

Surface parking, covered parking, 6 luxury apartments on 5th floor, community training room on 2nd floor, numerous tenant buildouts.

Categories :
Development, Featured Projects, Office, Recent Projects

get social:
facebookinstagramlinkedin

© 2025 - Brennan - All rights reserved