• facebook
  • instagram
  • linkedin

EI Microcircuits

EI Microcircuits’ facility was built from the ground up just outside of town in an area that is now known for large industrial and manufacturing facilities.

The factory portion was designed with efficiency and quality management in mind and therefore had to be built to match those same efficiency and quality standards.

Due to the nature of EI Microcircuits’ work with circuit boards and electronics, precision and security were top priorities on this project. This would be their third manufacturing facility to house their work space as well as front end office space.

Contact Us

201 N Riverfront Drive, Suite 210, Mankato, MN 56001

3255 Garfield Ave, Suite 200, Minneapolis, MN 55408

507-625-5417

Recent Projects

  • Tiller + Main
    Tiller + Main
    Housing, Recent Projects, Retail / Entertainment
  • Brennan Companies TI
    Brennan Companies TI
    Featured Projects, Office, Recent Projects
default
default
9.8.21
9.8.21
Tiller + Main

Formerly the Valley Green Mall, this development was integral to connecting Main Street in downtown LeSueur. Part of the building was demolished to make space for Main Street to connect. Main floor tenant spaces were remodeled or built out, including storefronts that would open onto Main Street. Tenants from the second level were moved down to the main floor. The second floor was then transformed into apartments.

56,000 SF. 17 apartments. 11 commercial suites.

Categories :
Housing, Recent Projects, Retail / Entertainment
IMG_1862
IMG_1862
6
6
2
2
1
1
Brennan Companies TI

Working with Roehrschmitt Architecture, we worked to design our own office in Bridge Plaza. Working with the curvature and general style of the building, we came up with a design that included bold maroon accents, modern glass walls, polished concrete flooring, and custom logo wallpaper.

Categories :
Featured Projects, Office, Recent Projects

get social:
facebookinstagramlinkedin

© 2024 - Brennan - All rights reserved